Full name - VG 250/ 92-200/FL-S AS:5/112/80H10 L:16
For intensive work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - TG 250/ 75-200/FL-S AS:5/112/80H10 D:16
For medium-intensity work and when heavy machinery travel or extra gentle work is required
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PG 230/ 70-170/FL-S AS:5/ 70/45H8 D:13H12 MIT FASE
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).