Minimum quantity should 2 of "Hoppecke 12TB120 – tinka pakeisti TROJAN T1275"
Load wheel 300 x 100 mm P400855
Full name - PG 300/100-250/10K-S 6210-2RS-C3 NL:100 EL:83,8 EN:113
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - VG 285/100-245/8KE-S JRM3940X2 NL:62 EL:42
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PG 285/100-245/8KE-(BR)-S JRM3940X2 NL:62 EL:42
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - VG 300/106-256/KE-(BR)-S BO:14 NL:80 AS:6/170 BO:16
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).