Minimum quantity should 4 of "Fullriver FFD245-6 AGM akumuliatorius, 6V245Ah, tinkantis pakesti TE35"
Fork wheel 82×82 mm 171869
Full name - VN 82/82/6K-S O.ISPB 6006-2RS EL: 86,4 (BO20)
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PN 85/110 /6K-S 6006-2RS EL:115 (BO:12Z)
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PN 85/95/6K-S 6006-2RS EL:101,4 (Bo:17K) o. Ispb
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - VN 85/100 /6K-S 6006-2RS EL:101,4 O.ISPB (BO:17K)
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).