“Noblelift CPD18 – AF1S : kelia 1,8 t. iki 4800 mm, triguba str., baterija – 76,8V 150Ah, su integruotu 35A įkrovikliu, bedurė kabina, EU Pack” has been added to your cart. View cart
125 x 40 mm support wheel 400475
Full name -PG 125 / 50-105/4K-S 6204-2RS, NL:50, EL:46
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PS 100/40-63/4K-S 6204-2RS NL:40 EL:42
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - VG 125/ 40-105/2K-S 6002-2RS NL:45 zyl.
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).