“PT 20Li operator platform trolley - 2000 kg with lithium battery 24V150Ah” has been added to your cart. View cart
254 x 90 mm impeller 185630
Full name - VG 254/ 90-210/FL-S AS:5/ 90/40H8 L:14,5
Designed for high-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - VG 230/ 70-170/FL-S AS:5/ 70/45H8 D:13H12 MIT FASE KTL-9005
For intensive work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PG 230/ 82-185/FL-S AS:5/ 70/45 D:14 +3*M10
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).
Full name - PG 230/ 70-170/FL-S AS:5/ 70/45H8 D:13H12 MIT FASE
For medium-intensity work
Delivery time: 3 - 4 days.
Full wheel drawing for checking - attached PDF document (or we can check by manufacturer, model and serial number - just write this information in the order notes).